↓ Skip to Main Content

Main Navigation

  • News
  • Baraka School
  • St. Monica Hospital
  • Association
  • Sponsorships
  • Links

Secondary Navigation

  • Deutsch
  • English

Author: Baraka

The first day of treatment:Wednesday, 15.01.2020

By Baraka Posted on 15. January 2020 Posted in Saint Monica Hospital

Expectant and tense, everyone awaited this day – will there be any patients at all, how many, have we thought of everything, have we forgotten nothing, …..?The surprise and joy was great – more than 100 patients were there, some …

The first day of treatment:Wednesday, 15.01.2020 Read more »

The time before the first day of treatment

By Baraka Posted on 8. January 2020 Posted in Saint Monica Hospital

Unfortunately, the start of treatment was delayed because some important things still had to be set in motion. During my stay at the beginning of January 2020, I was able to experience live the last days before the start of …

The time before the first day of treatment Read more »

The ramp is finished

By Baraka Posted on 2. September 2019 Posted in Saint Monica Hospital

An important milestone has been reached!From 01 October 2019, the first patients are to be treated in St. Monica. Among other still missing necessities e.g. equipment of the pharmacy with medicines, reagents for the laboratory, analog or digital X-ray machine …

The ramp is finished Read more »

Inauguration and partial opening on 06.08.2019

By Baraka Posted on 6. August 2019 Posted in Saint Monica Hospital

by Rev. Dr. Amedeus Macha and Kilimanjaro Regional Commissioner Dr. Anna Mghwira Ceremonies preparations: Already a few weeks before the inauguration ceremony, relatives, friends, locals met to prepare the celebration. They collected donations of money and goods (for example, chickens, …

Inauguration and partial opening on 06.08.2019 Read more »

The construction of the ramp is progressing very well.

By Baraka Posted on 10. June 2019 Posted in Saint Monica Hospital

Impressions

By Baraka Posted on 15. March 2019 Posted in Baraka School

March 2019:At the beginning of the month, the construction of the roof of the dormitory began. When the wooden substructure is finished, the roof panels will be installed. Because of the soon expected big rainy season, haste is required. General …

Impressions Read more »

Current status of the construction work March 2019

By Baraka Posted on 15. March 2019 Posted in Saint Monica Hospital

The work necessary for the planned partial opening of the hospital is progressing. Construction of the ramp began at the beginning of March. Around the same time, the sanitary areas such as showers and toilets will also be completed. Since …

Current status of the construction work March 2019 Read more »

Posts pagination

Previous 1 2 3 4

Footer Menu

  • Contact
  • Privacy policy
  • Imprint
  • Change privacy settings
  • Privacy settings history
  • Revoke consents

Copyright © 2025 Baraka Kinderhilfe e.V. | Powered by Responsive Theme

WordPress Cookie Notice by Real Cookie Banner